Case Study
Grounding error caught before mobilization — 120 MW utility-scale solar
During a 120 MW utility-scale build, our independent design review identified a grounding design error that would have required re-trenching across 40 acres.
Because it was caught before mobilization, the fix was a drawing change, not a field rebuild. The result: over $200K saved and COD kept on schedule.